---
title: Moving Machines Through Tight Doors and Aisles | ILS
url: https://machinerymovingnv.com/faq/tight-spaces/
business: Industrial Logistics Services, Inc. (ILS)
what: machinery moving, rigging, millwright services, installation and alignment, plant relocation, machinery transport, crating, storage
phone: (775) 882-3319
fax: (775) 882-2693 (fax only)
email: johns@ilsmachinerymoving.com
address: 3868 Goni Rd, Carson City, NV 89706
hours: Mon-Fri 7:00 am - 4:00 pm, Sat-Sun closed
licenses: Nevada contractor licenses 0046276, 0083124, 0083125; USDOT 642556, MC-531191
estimates: free
---

- [Home](https://machinerymovingnv.com/)
- [FAQ](https://machinerymovingnv.com/faq/)
- Can you get a machine through a tight door or aisle?

# Can you get a machine through a tight door or aisle?

Often yes. Doors, aisles and low ceilings are part of the planning, and ILS has tools sized for tight spots, from a 2-ton portable aluminum gantry to forklifts with rigging booms.

Key points

- Measure every opening on the path
- A 2-ton portable aluminum gantry works in tight spots
- Skates and rollers move heavy machines on the floor
- Some machines are partly dismantled to fit

Most machinery moves are decided at the building, not on the road. The widest and tallest the machine will be on the move, and the narrowest opening on its path, set the method.

## What we look at

- Door width and height
- Aisle width and turns
- Ceiling height, pipes and lights overhead
- Floor type and loading
- Ramps, steps and dock height

## Ways through

If a machine fits with room to spare, skates or a forklift take it through. If not, a portable gantry can lift it over an obstacle, or the machine can be dismantled and reinstalled at the other end; see [dismantling and reinstallation](https://machinerymovingnv.com/services/dismantling-reinstallation/).

### Sources (2)

- U.S. Occupational Safety and Health Administration : [osha.gov/laws-regs/regulations/standardnumber/1926/1926.251](https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.251) (checked November 2026)
- ASME : [asme.org/codes-standards/find-codes-standards/b30-9-slings](https://www.asme.org/codes-standards/find-codes-standards/b30-9-slings) (checked November 2026)

### Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

[Start the estimate](#estimate)

### Related

- [2-ton portable aluminum gantry](https://machinerymovingnv.com/equipment/portable-gantry/)
- [Industrial rigging](https://machinerymovingnv.com/services/rigging/)
- [How to measure a machine for a moving estimate](https://machinerymovingnv.com/guides/how-to-measure-a-machine/)
- [Lift planning basics for plant managers](https://machinerymovingnv.com/guides/lift-planning-basics/)

## Related questions

[All questions](https://machinerymovingnv.com/faq/)

### How tight is too tight?

There is no published number. Send the machine's dimensions and the door sizes and the office will tell you.

### What if the floor is weak?

Floor capacity is part of the plan. See [floor loads, anchors and machine foundations](https://machinerymovingnv.com/guides/floor-loads-and-foundations/).

### Can you lower a machine through an opening?

Lowering through openings is part of rigging. Send photos of the opening.

### Do I need to remove walls?

Not usually. Ask us before you cut anything.

### Which machines cause the most trouble?

Tall or wide machines, such as [tanks and silos](https://machinerymovingnv.com/what-we-move/tanks-and-silos/), and anything on a floor not rated for the weight.

### Do I have to empty the room first?

Clearing the route helps. Tell us what is in the way.

### Can the machine be moved without stopping production?

Plants rarely stop, so the estimate plans around your production areas.
