---
title: Grouting a Machine Base | ILS
url: https://machinerymovingnv.com/glossary/grouting/
business: Industrial Logistics Services, Inc. (ILS)
what: machinery moving, rigging, millwright services, installation and alignment, plant relocation, machinery transport, crating, storage
phone: (775) 882-3319
fax: (775) 882-2693 (fax only)
email: johns@ilsmachinerymoving.com
address: 3868 Goni Rd, Carson City, NV 89706
hours: Mon-Fri 7:00 am - 4:00 pm, Sat-Sun closed
licenses: Nevada contractor licenses 0046276, 0083124, 0083125; USDOT 642556, MC-531191
estimates: free
---

- [Home](https://machinerymovingnv.com/)
- [Glossary](https://machinerymovingnv.com/glossary/)
- Grouting

# Grouting

Grouting fills the space between a machine's base and the concrete beneath it. Once it cures, the machine rests on a solid bed instead of on shims and high spots.

Key points

- Fills the gap between base plate and foundation
- Carries load evenly across the full base
- Damps vibration and holds anchors in place
- Cementitious and epoxy grouts are common types
- Cure time must pass before final alignment is locked

Concrete is never perfectly flat. A machine set directly on it touches only the high points. Grout is poured or pumped under the base, flows to every low spot and hardens, so the whole base takes its share of the load and the machine holds its level.

## Why machines get grouted

A rotating or reciprocating machine shakes its foundation continuously. Without a full bed under the base, anchor bolts take the stress, shims creep and alignment drifts. Grout locks the base in place, adds mass and helps reduce vibration.

- Even bearing on the foundation
- Protects anchor bolts from shear and fatigue
- Helps hold alignment over time
- Seals the base edge from oil and moisture

## Where it falls in the install

Grouting comes after the machine has been set on its leveling shims or jacking screws and aligned to rough tolerance, and before the final alignment check. Forms are built around the base, the grout is placed in one continuous pour so air is pushed out, and it is cured to the manufacturer's schedule. Final leveling, with spirit levels and optical instruments, follows once the grout has gained strength.

- Prepare and clean the concrete surface
- Set and rough-level the machine on shims or jacks
- Build forms around the base
- Place grout in one continuous pour
- Cure, then check level and tighten anchors

## ILS and foundations

ILS describes handling a relocation "from start to finish," including engineering services, foundations and specialized transportation. For a new location, that planning includes how the machine will sit. The grout product and thickness come from the machine maker and the engineer, not from a general rule.

### Sources (2)

- concrete.org : [concrete.org/](https://www.concrete.org/) (checked November 2026)
- ASME : [asme.org/codes-standards/find-codes-standards/b30-9-slings](https://www.asme.org/codes-standards/find-codes-standards/b30-9-slings) (checked November 2026)

### Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

[Start the estimate](#estimate)

### Related

- [Millwright](https://machinerymovingnv.com/glossary/millwright/)
- [Machinery skates](https://machinerymovingnv.com/glossary/machinery-skates/)
- [Machine installation & assembly](https://machinerymovingnv.com/services/machine-installation/)
- [Engineering & foundations](https://machinerymovingnv.com/services/engineering-foundations/)
- [Floor loads, anchors and machine foundations](https://machinerymovingnv.com/guides/floor-loads-and-foundations/)

## Questions we hear

[All questions](https://machinerymovingnv.com/faq/)

### Is grout the same as concrete?

No. Machinery grout is a flowable, shrink-resistant material that works in thin layers under a base. Concrete has coarse aggregate and shrinks.

### Can a machine be aligned before the grout cures?

Rough alignment, yes. Final alignment is checked after cure, because the machine can shift as the material sets.
