title: How to Choose a Rigging Contractor | ILS Guide
url: https://machinerymovingnv.com/guides/choosing-a-rigging-contractor/
business: Industrial Logistics Services, Inc. (ILS)
what: machinery moving, rigging, millwright services, installation and alignment, plant relocation, machinery transport, crating, storage
phone: (775) 882-3319
fax: (775) 882-2693 (fax only)
email: johns@ilsmachinerymoving.com
address: 3868 Goni Rd, Carson City, NV 89706
hours: Mon-Fri 7:00 am - 4:00 pm, Sat-Sun closed
licenses: Nevada contractor licenses 0046276, 0083124, 0083125; USDOT 642556, MC-531191
estimates: free
---

- [Home](https://machinerymovingnv.com/)
- [Guides](https://machinerymovingnv.com/guides/)
- How to choose a rigging contractor

# How to choose a rigging contractor

Choose a rigging contractor on evidence you can check: an active Nevada license in the right class, a written scope, a lift plan for your machine, and a crew that asks about your floor, doors and utilities before it quotes. Price is the weakest way to separate bids, because the lowest scope is often the one that left something out.

Key points

- Verify the license and classification on the Nevada Contractors Board website
- Insist on a written scope that names who disconnects, rigs, hauls, sets and reconnects
- Ask to see the lift plan for your machine, not a generic one
- Ask how slings, hardware and spreader gear are inspected
- Walk the site together before the quote is final

A rigging job puts a heavy, expensive machine in the hands of outside people for a day or two. Most problems that come later trace back to questions nobody asked during the quote. The list below is written from the buyer's side. It describes generally accepted practice, so you can hold any bidder to it, including us.

## Start with license and authority

Rigging for hire in Nevada falls under contractor licensing, and the relevant class is C-14I, Rigging and Cranes. Look the company up on the Contractors Board search, confirm it reads Active and check the monetary limit. If trucks will cross state lines, the carrier should also show up in the FMCSA SAFER database with a USDOT number and operating authority.

A class named "Rigging and Cranes" tells you the license category. It does not tell you what equipment the company owns. Ask what will actually be on your floor. Our [license classes guide](https://machinerymovingnv.com/guides/nevada-contractor-license-classes/) explains how to read the record.

## What a good quote contains

A quote that says only "move machine, rig, set" leaves the hard parts undefined. Look for these items in writing, whoever the bidder is.

- The machine described by type, size and weight, with the source of the weight (nameplate, manual or measured)
- Pick and set locations, including floor and doorway conditions
- Who isolates and locks out utilities, and who reconnects them
- Who supplies permits, if the load needs one on the highway
- The method: forklift with boom, gantry, skates, or a combination
- What is excluded, for example electrical, plumbing, foundations or removal of obstructions
- Whether the price is firm or depends on conditions found on site

## Ask about the lift plan

A lift plan is a short written record of the load, the equipment, the route and who does what. ASME publishes a standard for it (ASME P30.1), and plenty of competent crews work from a one-page version. What matters is that it exists and was made for your machine. A rigger who has not seen the load or the building cannot plan the lift.

Ask who will be in charge on the day and what that person decides if the machine is heavier than the nameplate says, or the floor is not what the drawings show. The right answer is that the lift stops until the plan is changed.

## Equipment and gear

Ask what lifting equipment fits your load and whether the company owns it or hires it in. ILS publishes its own list: forklifts from 3,000 lbs. to 100,000 lbs. with rigging booms, a 300-ton hydraulic gantry system and a 2-ton portable aluminum gantry, plus slings, hoists and hand tools. Whatever a bidder lists, the capacity should be written down, not implied.

Slings and hardware must be inspected before use and removed from service when damaged (29 CFR 1910.184 for general industry). The details are in our guide to [rigging gear and inspection](https://machinerymovingnv.com/guides/rigging-gear-and-inspection/).

## Safety and site rules

Expect the contractor to follow your plant's own rules and to bring protective gear and trained people. Ask about site orientation, who signs the lockout, and how people are kept out of the area under a load. Be wary of any firm that treats these questions as a nuisance. Claims of perfect records are no substitute for seeing how the crew behaves during the walk-through.

## A short comparison sheet

Free estimates are standard in this trade. If a bidder wants payment before a look at the job, ask why.

A short comparison sheet Question Good sign Warning sign

License Active, correct class, number on the bid No number, or a class that does not match

Site visit Crew measures doors, floor and route Quote by phone with no questions

Scope Each step assigned to a named party One line item for everything

Lift plan Written, specific to your machine None offered

Change handling Written change order before extra work Surprises on the final invoice

### Sources (4)

- Nevada State Contractors Board : [app.nvcontractorsboard.com/Clients/NVSCB/Public/ContractorLicenseSearch/ContractorLicenseS](https://app.nvcontractorsboard.com/Clients/NVSCB/Public/ContractorLicenseSearch/ContractorLicenseSearch.aspx) (checked November 2026)
- FMCSA SAFER : [safer.fmcsa.dot.gov](https://safer.fmcsa.dot.gov) (checked November 2026)
- U.S. Occupational Safety and Health Administration : [osha.gov/laws-regs/regulations/standardnumber/1910/1910.184](https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.184) (checked November 2026)
- ASME : [asme.org/codes-standards/find-codes-standards/b30-9-slings](https://www.asme.org/codes-standards/find-codes-standards/b30-9-slings) (checked November 2026)

### Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

[Start the estimate](#estimate)

### Licensed in Nevada

Nevada State Contractors Board licenses 0046276 (C-33 Installing Industrial Machinery), 0083124 (A-14, A-20) and 0083125 (C-14I Rigging and Cranes, C-14J Conveyance of Goods). USDOT 642556, MC-531191.

[What the classes cover](https://machinerymovingnv.com/guides/nevada-contractor-license-classes/)

### Keep reading

- [Nevada contractor license classes for machinery work](https://machinerymovingnv.com/guides/nevada-contractor-license-classes/)
- [Lift planning basics for plant managers](https://machinerymovingnv.com/guides/lift-planning-basics/)
- [Industrial rigging](https://machinerymovingnv.com/services/rigging/)
- [Free estimate](https://machinerymovingnv.com/free-estimate/)
- [Rigging, slings, hoists & tools](https://machinerymovingnv.com/equipment/rigging-gear/)

## Questions we hear

[All questions](https://machinerymovingnv.com/faq/)

### How many quotes should I get?

Two or three comparable written quotes is usual. Give each bidder the same machine data and the same site access so the scopes line up.

### Should I hire the hauler and the rigger separately?

You can, but then you manage the handoff between them. One firm that holds both the rigging license and the carrier authority removes that handoff.

### What should I send for an estimate?

The machine type, weight, dimensions, photos of the machine and the route, the pickup and set addresses, and any dates you cannot move.