---
title: Lockout/Tagout Before a Machinery Move | ILS
url: https://machinerymovingnv.com/guides/lockout-tagout-before-a-move/
business: Industrial Logistics Services, Inc. (ILS)
what: machinery moving, rigging, millwright services, installation and alignment, plant relocation, machinery transport, crating, storage
phone: (775) 882-3319
fax: (775) 882-2693 (fax only)
email: johns@ilsmachinerymoving.com
address: 3868 Goni Rd, Carson City, NV 89706
hours: Mon-Fri 7:00 am - 4:00 pm, Sat-Sun closed
licenses: Nevada contractor licenses 0046276, 0083124, 0083125; USDOT 642556, MC-531191
estimates: free
---

- [Home](https://machinerymovingnv.com/)
- [Guides](https://machinerymovingnv.com/guides/)
- Lockout/tagout before a machinery move

# Lockout/tagout before a machinery move

Before a machine is serviced, disconnected or lifted, the employer who owns it must isolate every energy source, lock or tag it, relieve stored energy and verify the machine is at zero energy (29 CFR 1910.147). The plant's own energy control program governs; a mover works inside it.

Key points

- The rule is OSHA 29 CFR 1910.147, the control of hazardous energy
- The employer that owns the machine writes and enforces the procedure
- Every energy source is isolated: electrical, hydraulic, pneumatic, gas, thermal, gravity and springs
- Outside contractors and the plant exchange their procedures before work
- The machine is verified de-energized before anyone reaches in or disconnects

Lockout/tagout is the plant's procedure, not the mover's. Nevada runs its own OSHA state plan through the Division of Industrial Relations, and it adopts the federal general industry rule. This guide describes what that rule says and how the work is usually divided on a move. It does not certify any program, and the plant's safety manager owns the details.

## What the rule requires

The standard covers servicing and maintenance of machines where unexpected start-up or release of stored energy could injure someone. An employer must have an energy control program with written procedures, lockout or tagout devices, training for the people involved, and periodic inspection of the procedures. Relocating a machine means disconnecting it from power, air, water and other utilities, so the plant treats it as servicing work under its program.

## The steps in a typical procedure

Each plant writes its own procedure for each machine, but the sequence follows the standard's pattern.

- Prepare: identify the type and amount of energy and how to control it
- Notify everyone affected that the machine will be shut down
- Shut the machine down using the normal stopping procedure
- Isolate every energy source with the disconnects, valves and blocks listed in the procedure
- Apply locks or tags to each isolating device, and keep the keys with the person who applied them
- Relieve or restrain stored energy, such as capacitors, springs, hydraulic and air pressure, and raised parts
- Verify isolation by trying the controls to confirm the machine cannot start

## How lockout fits with the move

The disconnect step of a move is where lockout matters most. Electricians open the supply, and the plant's authorized employees apply locks before anything is unbolted. The rigging crew should see the locks in place and know who holds the keys. A lock is removed only by the person who placed it, and only after the work is done and the area is clear. On the receiving end, a machine that is set, leveled and reconnected is not re-energized until the plant says so. The [disconnect and reconnect](https://machinerymovingnv.com/services/disconnect-reconnect/) service page shows how ILS coordinates the timing of each disconnect and reconnect.

## Outside contractors

The standard has a section on outside personnel. When a contractor works at a plant, the plant and the contractor must inform each other of their lockout or tagout procedures, and the plant makes sure its employees understand and respect the restrictions of the contractor's procedure. In plain terms: show the crew your procedure at the pre-job meeting, and ask them to show theirs.

## Stored energy that surprises people

Most injuries around machines come from energy that was not obvious. A raised ram, a pressurized accumulator, a spring-loaded clamp, a flywheel still coasting, and a capacitor bank can all hurt someone after the main disconnect is open. Gravity counts too: a table or head that can drop needs blocking. Your machine's manual and your maintenance team know which apply. Tell the estimator if the machine has any of them. [Preparing the machine](https://machinerymovingnv.com/guides/prepare-a-machine-for-moving/) lists the related fluid and loose-part steps.

## Who is responsible for what

The plant's responsibility: the written procedure, the locks, the training and the verification. The rigging crew's responsibility: its own safe work in the lift, its rigging gear, and stopping work if it sees a hazard. ILS describes the rule here; it does not claim to meet or exceed any particular company's program on its behalf. For Nevada questions, the Division of Industrial Relations OSHA office is the authority.

### Sources (2)

- U.S. Occupational Safety and Health Administration : [osha.gov/laws-regs/regulations/standardnumber/1910/1910.147](https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.147) (checked November 2026)
- Nevada Division of Industrial Relations : [dir.nv.gov/OSHA/Home/](https://dir.nv.gov/OSHA/Home/) (checked November 2026)

### Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

[Start the estimate](#estimate)

### Licensed in Nevada

Nevada State Contractors Board licenses 0046276 (C-33 Installing Industrial Machinery), 0083124 (A-14, A-20) and 0083125 (C-14I Rigging and Cranes, C-14J Conveyance of Goods). USDOT 642556, MC-531191.

[What the classes cover](https://machinerymovingnv.com/guides/nevada-contractor-license-classes/)

### Keep reading

- [How to prepare a machine before the riggers arrive](https://machinerymovingnv.com/guides/prepare-a-machine-for-moving/)
- [Disconnect & reconnect coordination](https://machinerymovingnv.com/services/disconnect-reconnect/)
- [How a machinery move works, step by step](https://machinerymovingnv.com/guides/how-machinery-moving-works/)
- [Lift planning basics for plant managers](https://machinerymovingnv.com/guides/lift-planning-basics/)
- [How to choose a rigging contractor](https://machinerymovingnv.com/guides/choosing-a-rigging-contractor/)

## Questions we hear

[All questions](https://machinerymovingnv.com/faq/)

### Does ILS do the lockout?

Lockout belongs to the plant that owns the machine under its energy control program. ILS works inside that program, confirms the machine is locked out before rigging begins, and coordinates the timing of disconnects.

### What if the machine has no disconnect or is hard-wired?

Say so when you request the estimate. Hard-wired machines usually need an electrician to open the supply at the panel, and who arranges it is agreed in the estimate.

### Is lockout the same as tagout?

No. A lock physically prevents the energy source from being turned on, while a tag is a warning label. The standard prefers locks where the device can accept one, and the plant's procedure sets the details.
