title: Dismantling & Reinstallation of Machinery | ILS
url: https://machinerymovingnv.com/services/dismantling-reinstallation/
business: Industrial Logistics Services, Inc. (ILS)
what: machinery moving, rigging, millwright services, installation and alignment, plant relocation, machinery transport, crating, storage
phone: (775) 882-3319
fax: (775) 882-2693 (fax only)
email: johns@ilsmachinerymoving.com
address: 3868 Goni Rd, Carson City, NV 89706
hours: Mon-Fri 7:00 am - 4:00 pm, Sat-Sun closed
licenses: Nevada contractor licenses 0046276, 0083124, 0083125; USDOT 642556, MC-531191
estimates: free
---

- [Home](https://machinerymovingnv.com/)
- [Services](https://machinerymovingnv.com/services/)
- Dismantling & reinstallation

# Dismantling and reinstallation

Dismantling takes a machine or line apart into pieces small enough to move, and reinstallation puts it back together and brings it back to working order. ILS has experience dismantling and reinstalling large, complex machinery systems, and does both ends of the job with the same crew.

Key points

- Large, complex machinery systems taken apart and rebuilt
- Labels and photo records at disassembly make reassembly faster
- Rigging support for heavy components
- Reassembly, leveling and alignment at the new site
- Tall equipment lowered and moved in sections

Some machines cannot go through a door, onto a legal-size trailer or around a tight turn in one piece. They have to be taken apart in a planned order, labeled, moved and rebuilt. We are experts in unique rigging for heavy equipment and in dismantling and reinstalling large, complex machinery systems.

## When a machine has to come apart

A machine is taken apart when its overall size or weight is too much to move whole, when the building has no opening large enough, or when the permit and trailer limits for an oversize load make a split shipment more practical. Some equipment, such as a tall piece of processing equipment, simply has to come down in stages.

- Machines wider or taller than the available openings
- Tall structures that must be lowered in sections
- Production lines made up of linked modules
- Equipment with parts that need inspection or rebuilding
- Loads over legal height, width, length or weight

## How a teardown is done safely

Dismantling starts with energy. All power, air, hydraulic and fluid sources are shut off and locked out under the plant's own lockout/tagout program (29 CFR 1910.147) before any fastener comes off. Then each component is supported before it is released, because parts that were held in place by the machine's own frame can shift or drop once bolts are removed.

- Lock out and tag every energy source with the plant's team
- Photograph the machine and mark mating parts
- Drain and cap fluids; cap open lines and ports
- Support each section with rigging before unbolting
- Remove, label and bag hardware by location
- Crate or skid sections for travel

## Records that save time at reassembly

The best predictor of a smooth reassembly is a good record of the teardown. A good teardown record means photos before and during the work, tagged cables and lines, and hardware sorted by location. When the pieces arrive, the machine is built back in reverse order from the same notes. Manufacturer drawings and manuals help if you have them, and we ask for them early.

## Reinstallation, leveling and alignment

Once sections are rigged into place, the crew bolts the frame together, reconnects mechanical drives, and sets the whole machine on its foundation. Then comes final leveling and alignment with optical levels, theodolites and laser levels. See [precision leveling and alignment](https://machinerymovingnv.com/services/precision-alignment/) for the instruments and the method.

## Fluids, fasteners and small parts

Small parts cause big delays. A missing set of special bolts or a lost shim pack can stop reassembly for days. Hardware bagged and tagged by location, shims kept in the order they came out, and every hose and port capped before it leaves the machine keep dirt out of hydraulic and air systems. Fluids are drained to the level the manufacturer recommends.

## What to send for a dismantling estimate

Send photos from every side, the machine type, its approximate size and weight, any manuals or drawings, and an idea of what the machine does so we can see where it should split. Tell us the new location too, so we can plan reassembly. Estimates are free.

### Sources (3)

- U.S. Occupational Safety and Health Administration : [osha.gov/laws-regs/regulations/standardnumber/1910/1910.147](https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.147) (checked November 2026)
- U.S. Occupational Safety and Health Administration : [osha.gov/laws-regs/regulations/standardnumber/1910/1910.184](https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.184) (checked November 2026)
- ASME : [asme.org/codes-standards/find-codes-standards/b30-9-slings](https://www.asme.org/codes-standards/find-codes-standards/b30-9-slings) (checked November 2026)

### Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

[Start the estimate](#estimate)

### Licensed in Nevada

Nevada State Contractors Board licenses 0046276 (C-33 Installing Industrial Machinery), 0083124 (A-14, A-20) and 0083125 (C-14I Rigging and Cranes, C-14J Conveyance of Goods). USDOT 642556, MC-531191.

[What the classes cover](https://machinerymovingnv.com/guides/nevada-contractor-license-classes/)

### Related services

- [Plant & factory relocation](https://machinerymovingnv.com/services/plant-relocation/)
- [Industrial rigging](https://machinerymovingnv.com/services/rigging/)
- [Disconnect & reconnect coordination](https://machinerymovingnv.com/services/disconnect-reconnect/)
- [How to prepare a machine before the riggers arrive](https://machinerymovingnv.com/guides/prepare-a-machine-for-moving/)
- [Lockout/tagout before a machinery move](https://machinerymovingnv.com/guides/lockout-tagout-before-a-move/)
- [Machinery moving](https://machinerymovingnv.com/services/machinery-moving/)
- [Industrial rigging](https://machinerymovingnv.com/services/rigging/)
- [Millwright services](https://machinerymovingnv.com/services/millwright-services/)
- [Machine installation & assembly](https://machinerymovingnv.com/services/machine-installation/)
- [Precision leveling & alignment](https://machinerymovingnv.com/services/precision-alignment/)
- [Plant & factory relocation](https://machinerymovingnv.com/services/plant-relocation/)

## Dismantling & reinstallation: questions

[All questions](https://machinerymovingnv.com/faq/)

### Does ILS take machines apart and put them back together?

Yes. Dismantling and reinstalling large, complex machinery systems is part of the company's published work.

### Do you work with the manufacturer's manual?

Yes, when you have one. Manuals show lift points, split lines and tolerances, and they shorten the planning.

### Can you lower a tall structure in sections?

Often, depending on the structure and the site. We look at the machine and the surroundings before we say yes, and the plan describes the rigging for each stage.