---
title: Generator Moving and Setting in Northern Nevada | ILS
url: https://machinerymovingnv.com/what-we-move/generators/
business: Industrial Logistics Services, Inc. (ILS)
what: machinery moving, rigging, millwright services, installation and alignment, plant relocation, machinery transport, crating, storage
phone: (775) 882-3319
fax: (775) 882-2693 (fax only)
email: johns@ilsmachinerymoving.com
address: 3868 Goni Rd, Carson City, NV 89706
hours: Mon-Fri 7:00 am - 4:00 pm, Sat-Sun closed
licenses: Nevada contractor licenses 0046276, 0083124, 0083125; USDOT 642556, MC-531191
estimates: free
---

- [Home](https://machinerymovingnv.com/)
- [What we move](https://machinerymovingnv.com/what-we-move/)
- Generators

# Generator moving and installation

An industrial generator is moved by emptying or securing its fluids, lifting it at the base-frame lifting points, and setting it on a level pad with the vibration mounts in place. ILS holds a Nevada C-33 Installing Industrial Machinery license and has the capacity of moving and relocating equipment weighing up to 300 tons.

Key points

- Lift at the base-frame lifting points, never at the engine or alternator
- Fuel, coolant and oil status is settled before the set is lifted
- Batteries come out or are disconnected before transport
- Rooftop and enclosure sets are planned lift by lift
- Free estimates from the data plate, photos and site access

Standby and prime-power generators sit outdoors on pads, in enclosures, on roofs and inside plants. The set is usually an engine and an alternator on a common steel base, and that base is what the rigging is built around. Industrial Logistics Services lists power generators among the industries it works with.

## What a generator move involves

A generator set is heavy for its size and the weight is not evenly spread: the engine end is much heavier than the alternator end. The dry weight on the data plate or spec sheet is the starting point, and the wet weight with fuel in the base tank is higher. Smaller portable sets go on a pallet and a forklift. Larger sets are lifted by their base-frame lugs with slings and spreader hardware or skidded into place.

Sets in sound-attenuated enclosures add height and a lifting frame on the roof of the housing. The manufacturer's lifting diagram shows which points to use and at what angle.

## Preparing the set

Before the move the unit is shut down, the starting circuit and the transfer switch are locked out, and the fuel is drained or secured according to the manufacturer. Coolant and lube oil levels matter because a tipped unit can spill. Batteries are disconnected and carried separately.

- Lock out the engine start and the transfer switch before anyone works on the set
- Drain or secure the fuel; a base tank can hold a lot of weight
- Disconnect and remove batteries
- Close or tape louvers, doors and exhaust openings for the road
- Photograph the connections before they come apart

## Setting it on the new pad

A generator needs a flat, solid pad. Concrete foundations and anchor layouts come from the manufacturer's installation drawings. ILS offers engineering services and foundations as part of a relocation project, and the work of leveling the base and shimming the vibration mounts is millwright work. See our [machine installation](https://machinerymovingnv.com/services/machine-installation/) page for how that part goes.

After the set is down, the fuel lines, exhaust, batteries and power cables are reconnected and the unit is tested. Who makes each connection is agreed in the estimate.

## Which ILS equipment applies

Forklifts from 3,000 lbs. to 100,000 lbs. with rigging booms cover most sets that sit at ground level or on a dock. A 300-ton hydraulic gantry system is available for lifts where a forklift cannot reach or the floor will not carry one, and a 2-ton portable aluminum gantry handles light lifts in tight spaces. Hauling is on ILS trucks with single-drop and double-drop equipment trailers to 50 tons.

## What to send for an estimate

Send the make and model from the data plate if you have it, the dry weight, the overall length, width and height, and photos of the pad, the doors and the access path. Tell us whether the set is in an enclosure and whether the base tank holds fuel. We give free estimates.

### Sources (4)

- U.S. Occupational Safety and Health Administration : [osha.gov/laws-regs/regulations/standardnumber/1910/1910.147](https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.147) (checked November 2026)
- U.S. Occupational Safety and Health Administration : [osha.gov/laws-regs/regulations/standardnumber/1910/1910.184](https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.184) (checked November 2026)
- ASME : [asme.org/codes-standards/find-codes-standards/b30-9-slings](https://www.asme.org/codes-standards/find-codes-standards/b30-9-slings) (checked November 2026)
- Nevada Legislature : [leg.state.nv.us/nrs/nrs-624.html](https://www.leg.state.nv.us/nrs/nrs-624.html) (checked November 2026)

### Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

[Start the estimate](#estimate)

### Licensed in Nevada

Nevada State Contractors Board licenses 0046276 (C-33 Installing Industrial Machinery), 0083124 (A-14, A-20) and 0083125 (C-14I Rigging and Cranes, C-14J Conveyance of Goods). USDOT 642556, MC-531191.

[What the classes cover](https://machinerymovingnv.com/guides/nevada-contractor-license-classes/)

### Related

- [Power generation & transformers](https://machinerymovingnv.com/industries/power-and-utilities/)
- [Machine installation & assembly](https://machinerymovingnv.com/services/machine-installation/)
- [300-ton hydraulic gantry system](https://machinerymovingnv.com/equipment/hydraulic-gantry/)
- [Engineering & foundations](https://machinerymovingnv.com/services/engineering-foundations/)
- [Transformers](https://machinerymovingnv.com/what-we-move/transformers/)

## Questions we hear

[All questions](https://machinerymovingnv.com/faq/)

### Do I need to drain the fuel before you move a generator?

The manufacturer's instructions govern that. A base tank with fuel adds weight and a spill risk, so the plan, including who drains or secures the fuel, is settled in the estimate.

### Can you lift a generator onto a roof?

A rooftop lift depends on the weight, the reach and the structure under it. Send photos and dimensions and the lift is planned from there. A structural engineer must confirm that the roof can carry the load.

### Who connects the generator to the building?

ILS moves, sets and levels the unit. Who handles the electrical termination and fuel piping is agreed in the estimate.
