title: Commercial Safe and Vault Moving in Nevada | ILS
url: https://machinerymovingnv.com/what-we-move/safes-and-vaults/
business: Industrial Logistics Services, Inc. (ILS)
what: machinery moving, rigging, millwright services, installation and alignment, plant relocation, machinery transport, crating, storage
phone: (775) 882-3319
fax: (775) 882-2693 (fax only)
email: johns@ilsmachinerymoving.com
address: 3868 Goni Rd, Carson City, NV 89706
hours: Mon-Fri 7:00 am - 4:00 pm, Sat-Sun closed
licenses: Nevada contractor licenses 0046276, 0083124, 0083125; USDOT 642556, MC-531191
estimates: free
---

- [Home](https://machinerymovingnv.com/)
- [What we move](https://machinerymovingnv.com/what-we-move/)
- Commercial safes & vaults

# Commercial safe and vault moving

A commercial safe is moved on skates or a low dolly, lifted with a forklift boom or a gantry when it has to go up or down, and set on a floor that has been checked for load. ILS rigs and moves commercial safes, vault doors and security cabinets for banks, offices and stores, and other businesses.

Key points

- Banks, offices, stores and similar businesses
- Weight and footprint are checked against the floor before the move
- Locks and relockers are handled by a locksmith or the safe company
- Safes are moved upright on skates unless the maker says otherwise
- Free estimates from the model plate, photos and a floor plan

Commercial safes are some of the densest objects a building holds. Office safes are heavy for their size; the weight is on the plate or in the maker's literature; bank-grade safes, vault doors and depository units weigh far more. The weight sits in a small footprint, which puts a load of pounds per square foot onto a floor that ordinary construction may not carry.

## Weight and floor loading

The weight of a safe is on its plate or in the manufacturer's literature. Typical office and business safes are heavy for their size, and fire-resistant models carry insulation that adds weight. Vault doors and modular vault panels weigh far more. The safe's weight is concentrated in a small area, so the floor under it, the route to it and any ramp must be checked. A structural engineer can confirm a slab or an upper floor.

On a ground-floor slab, plywood and steel plates spread the load during the move. Upstairs, a safe may be hoisted from outside instead of moved through the stairwell.

## How a safe is moved

Safes are moved upright with machinery skates and low-profile dollies, using bars and jacks to get under the base. Where a safe must change levels, a forklift with a rigging boom, a hydraulic gantry or hoisting equipment does the lift. Our general [rigging](https://machinerymovingnv.com/services/rigging/) work follows the same lift-planning steps used on machine tools.

- Confirm the model, weight and dimensions
- Measure doors, hallways, corners and thresholds
- Check floor capacity and lay protection
- Skate or hoist the safe along the planned route
- Set it in the new position and check it is level and plumb
- The owner's locksmith or safe company reprograms the lock if needed

## Doors, locks and relockers

A safe door with a boltwork and a relocker is a mechanism that can lock itself if the safe is tilted or shocked. A locksmith or the safe company should be on hand, or should be told of the move in advance, and the combination should be known. Opening, drilling or changing a lock is work for a locksmith or the safe company.

## Anchoring

Many commercial safes are bolted to the floor. Anchoring into a concrete slab is a construction task, and permanently attaching equipment to a structure falls under Nevada's contractor licensing rules (NRS 624). ILS holds C-33 Installing Industrial Machinery and A-14 licenses; ask about anchoring when you request an estimate.

## What to send

Send a photo of the safe and its plate, the dimensions, the weight, the start and end locations, and a photo of the route including steps or ramps. Estimates are free.

### Sources (4)

- U.S. Occupational Safety and Health Administration : [osha.gov/laws-regs/regulations/standardnumber/1910/1910.178](https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.178) (checked November 2026)
- U.S. Occupational Safety and Health Administration : [osha.gov/laws-regs/regulations/standardnumber/1910/1910.184](https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.184) (checked November 2026)
- ASME : [asme.org/codes-standards/find-codes-standards/b30-9-slings](https://www.asme.org/codes-standards/find-codes-standards/b30-9-slings) (checked November 2026)
- Nevada Legislature : [leg.state.nv.us/nrs/nrs-624.html](https://www.leg.state.nv.us/nrs/nrs-624.html) (checked November 2026)

### Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

[Start the estimate](#estimate)

### Licensed in Nevada

Nevada State Contractors Board licenses 0046276 (C-33 Installing Industrial Machinery), 0083124 (A-14, A-20) and 0083125 (C-14I Rigging and Cranes, C-14J Conveyance of Goods). USDOT 642556, MC-531191.

[What the classes cover](https://machinerymovingnv.com/guides/nevada-contractor-license-classes/)

### Related

- [Industrial rigging](https://machinerymovingnv.com/services/rigging/)
- [Forklifts with rigging booms (3,000 to 100,000 lbs.)](https://machinerymovingnv.com/equipment/rigging-forklifts/)
- [300-ton hydraulic gantry system](https://machinerymovingnv.com/equipment/hydraulic-gantry/)
- [Machinery moving](https://machinerymovingnv.com/services/machinery-moving/)
- [How to measure a machine for a moving estimate](https://machinerymovingnv.com/guides/how-to-measure-a-machine/)

## Questions we hear

[All questions](https://machinerymovingnv.com/faq/)

### Who should call about a safe move?

ILS moves commercial safes and vaults; call the office about any safe move.

### Who opens or rekeys a safe?

Opening, drilling or changing a lock is work for a locksmith or the safe company.

### How do you protect the floor?

With plywood and steel plates over the route and at the final position. The owner confirms the floor capacity for the safe's weight.