Can ILS install and level the machine after the move?
Yes. ILS holds a Nevada C-33 Installing Industrial Machinery license and sets, levels and aligns machines with optical levels, theodolites and laser levels.
- Nevada Contractors License 46276
- USDOT 642556 · our own trucks
- 4.6 on Google (15 reviews)
Key points
- Installation under Nevada license 0046276 (C-33)
- Optical levels and theodolites (1 arc second)
- Spirit levels accurate to .0005" in 12"
- Engineering and foundations as part of a relocation
Moving a machine is half the job. A machine that is not set and leveled correctly will not run to spec, which is why installation can be part of the same estimate as the move.
What setting a machine involves
- Place the machine on its foundation or pad
- Anchor it where the maker's instructions call for it
- Level it with precision instruments
- Align it to its reference points
- Hand it over for reconnection as agreed in the estimate
Where installation starts and stops
Disconnecting and reconnecting power, air, water and controls is coordinated with your own staff or contractors; see disconnect and reconnect coordination. Leveling methods are described in how machines are leveled and aligned.
Sources (3)
- Nevada Legislature: leg.state.nv.us/nac/nac-624.html (checked November 2026)
- Nevada Legislature: leg.state.nv.us/nrs/nrs-624.html (checked November 2026)
- U.S. Occupational Safety and Health Administration: osha.gov/laws-regs/regulations/standardnumber/1910/1910.147 (checked November 2026)
Send the machine details
Type, size, weight, where it is and where it is going. Photos help. Estimates are free.
Start the estimateIs installation part of every move?
No. Tell us whether you want it and it goes into the estimate.
Which instruments do you use?
Optical levels and theodolites (1 arc second), high accuracy laser levels and spirit levels accurate to .0005" in 12".
Can you prepare foundations?
From start to finish, ILS will handle your entire relocation project, including engineering services, foundations and specialized transportation. See engineering and foundations.
Can you install a machine someone else moved?
Ask the office. Describe the machine and where it is.
Do you wire the machine in?
Who handles electrical hookup is agreed in the estimate. Ask the office what is needed on your job.
Does installation work in California?
Installation work in California is quoted case by case.
Why does the license matter?
Under NAC 624, installing industrial machinery that is permanently affixed to a structure takes a contractor license.
Free estimates
Tell us what needs moving.
Free estimates on every job, big or small. Call the office or send the machine details and we will call you back.
(775) 882-3319Monday to Friday, 7:00 am to 4:00 pm. Fax (775) 882-2693.
- Nevada Contractors License 46276
- USDOT 642556 · our own trucks
- Carson City since 1999
- 4.6 on Google (15 reviews)