3868 Goni Rd, Carson City, Nevada 89706Fax: (775) 882-2693Nevada Contractors License 46276Phone: (775) 882-3319
Industrial Logistics Services badgeIndustrial LogisticsServices, Inc.Machinery moving & installation(775) 882-3319

UPS and data center equipment moving

UPS cabinets, battery strings, switchgear and server racks are moved on padded trailers with the batteries disconnected, the loads tied down at the frame, and the vibration kept low. ILS rigs, hauls and sets this equipment, with forklifts from 3,000 lbs. to 100,000 lbs. with rigging booms.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • 4.6 on Google (15 reviews)

Key points

  • Batteries are disconnected, and often shipped separately, before any move
  • UPS cabinets are heavy at the bottom; lift from the base only
  • Server racks are moved empty or per the manufacturer's guidance
  • Floor loading in the new room is checked before delivery
  • Free estimates from nameplates and a photo of the route

Data center and power-protection equipment is dense and heavy and also sensitive to shock. A battery cabinet can weigh as much as a small machine tool, and a rack of servers can be damaged by a hard dock bump. The job is partly rigging and partly careful handling.

Heavy cabinets and fragile electronics

Large UPS systems and switchgear lineups are tall steel cabinets with a high center of gravity. They weigh from hundreds of pounds for a small unit to several tons for a large one, with the weight from transformers and batteries concentrated low. The manufacturer's instructions on lifting points and tilt limits govern how they are moved.

Server racks are usually moved empty of equipment so the weight stays low and the electronics are not shaken. Fully loaded racks, where the owner chooses it, need a specific plan with the rack maker's rating for shipping.

Batteries

UPS batteries are the most regulated part of the job. Lead-acid and lithium-ion batteries are classed as hazardous materials in transport, and rules for packaging and shipping come from the U.S. Department of Transportation (49 CFR parts 171-180). The usual approach is to disconnect the strings, take the batteries out of the cabinet and move them with a carrier that handles that cargo. Ask us in your estimate request whether the batteries come with the cabinet or on their own.

  • Open the DC disconnect and lock out the system
  • Remove the batteries or isolate each string
  • Protect terminals with covers
  • Keep battery trays upright and secured
  • Dispose of or recycle old batteries through a battery recycler

The route and the floor

Computer rooms have raised floors, narrow doors and sometimes ramps. A raised floor tile system carries a rated load; a heavy cabinet may need plywood or steel plates laid over the route and an under-floor pedestal at the final position. The building engineer confirms the load rating, and we place the protection and move the cabinet slowly on skates or a low-profile machinery dolly.

Dock, trailer and handoff

Hauling is on ILS trucks, and trailer choice depends on the load: curtain trailers for dry protected freight, or equipment trailers for heavier gear. Once the cabinet is in position, it is terminated, started up and tested; who handles each step is agreed in the estimate.

What to send

Send the model, weight and size of each cabinet, whether the batteries stay inside, photos of the loading dock and the route, and the floor type at the new room. Estimates are free.

Sources (4)

Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

Start the estimate

Licensed in Nevada

Nevada State Contractors Board licenses 0046276 (C-33 Installing Industrial Machinery), 0083124 (A-14, A-20) and 0083125 (C-14I Rigging and Cranes, C-14J Conveyance of Goods). USDOT 642556, MC-531191.

What the classes cover

FAQ

Questions we hear

All questions

Do you move the batteries too?

Batteries are regulated cargo. Tell us what you have, and we plan with you whether they move with the cabinet or separately.

Can you move a full server rack?

It depends on the weight, the rack rating and the equipment inside. Many owners remove servers first; we plan around your choice.

Who starts up the UPS after the move?

Who handles startup and testing is agreed in the estimate.

Free estimates

Tell us what needs moving.

Free estimates on every job, big or small. Call the office or send the machine details and we will call you back.

(775) 882-3319

Monday to Friday, 7:00 am to 4:00 pm. Fax (775) 882-2693.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • Carson City since 1999
  • 4.6 on Google (15 reviews)

Request a free estimate

Your details
The machine

Up to 8 photos. Big photos are resized on your device before they are sent.

Free estimates. Your details go only to Industrial Logistics Services. We call back Monday to Friday, 7 am to 4 pm.