3868 Goni Rd, Carson City, Nevada 89706Fax: (775) 882-2693Nevada Contractors License 46276Phone: (775) 882-3319
Industrial Logistics Services badgeIndustrial LogisticsServices, Inc.Machinery moving & installation(775) 882-3319

Mining equipment moving and rigging

Mining equipment is moved in sections: crushers, screens, feeders, pumps and hoist parts are unbolted, tagged, lifted by their lifting points and hauled on heavy equipment trailers. ILS has the capacity of moving and relocating equipment weighing up to 300 tons, with a 300-ton hydraulic gantry system and trailers to 50 tons.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • 4.6 on Google (15 reviews)

Key points

  • Large assemblies are broken into transportable sections
  • Lifting points, weights and center of gravity come from the maker's drawings
  • Overweight and overwide loads need NDOT permits and sometimes pilot cars
  • Site safety rules come from the mine operator
  • Free estimates from drawings, photos and the haul route

Nevada is a major mining state, and mining is one of the industries where heavy rigging is a regular need. Process plants, crushing circuits, conveyors, pumps and headframe components are large, heavy and often located far from a paved road. Industrial Logistics Services lists mining among the industries it works with.

What gets moved

Mining equipment includes crushers (jaw, cone and impact), vibrating screens, feeders, conveyors, pumps, motors and gearboxes, compressors, hoist drums, generators and structural steel. Each has a different shape and weight. A jaw crusher is a dense block of steel; a screen is wide and long; a hoist drum is heavy and cylindrical. A shop-built piece of equipment may have no maker's lift points at all, and in that case the rigging plan builds them from the drawings.

Our page on conveyors and material handling covers belts and structures that go with the circuit.

  • Crushers and feeders
  • Vibrating screens and sorting equipment
  • Pumps, motors and gearboxes
  • Hoist drums and headframe components
  • Generators, compressors and switchgear
  • Conveyor sections and structural steel

Planning the lift and haul

For large pieces, the lift plan starts with weight and center of gravity. ASME P30.1 describes how to plan a lift; the B30 standards cover slings, hardware and gantries. Our 300-ton hydraulic gantry system and forklifts to 100,000 lbs. with rigging booms cover most of the lifts at a plant or yard. For a lift that needs a crane, ILS coordinates with the crane contractor the owner or mine chooses.

  1. Gather the maker's drawings, weights and lift points
  2. Review the site access, ground conditions and any rules from the mine
  3. Select the lifting method and the rigging gear
  4. Plan the trailer, axle loads and permits
  5. Disassemble, tag and photograph
  6. Lift, load, secure and haul

On the road

Heavy mining equipment often exceeds Nevada's legal limits of 14 ft in height, 102 inches in width, 70 ft combination length and the federal 80,000 lb gross weight. Those loads need a single-trip or annual permit from NDOT (NRS 484D.725 and NAC 484D), and pilot cars when the load is wide or tall enough (NAC 484D.670). Our oversize load checker shows the thresholds.

Working at a mine

Mine sites have their own safety training and entry rules, which come from the mine operator and from federal and state mining agencies. Our team follows the site's rules, and we ask for them with the estimate request.

What to send

Send the equipment list, drawings with weights, photos, the pickup and delivery locations, and any access constraints. Estimates are free.

Sources (4)

Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

Start the estimate

Licensed in Nevada

Nevada State Contractors Board licenses 0046276 (C-33 Installing Industrial Machinery), 0083124 (A-14, A-20) and 0083125 (C-14I Rigging and Cranes, C-14J Conveyance of Goods). USDOT 642556, MC-531191.

What the classes cover

FAQ

Questions we hear

All questions

How heavy a piece of mining equipment can ILS move?

ILS has the capacity of moving and relocating equipment weighing up to 300 tons. Trailers run to 50 tons, and heavier assemblies are broken into sections.

Do you install the equipment at the new site?

ILS holds a Nevada C-33 Installing Industrial Machinery license and an A-14 Steel Erection and Industrial Machinery license. The scope of installation is settled in the estimate.

Can you work in remote locations?

Distance and terrain are part of the estimate. Send the location and the access road details.

Free estimates

Tell us what needs moving.

Free estimates on every job, big or small. Call the office or send the machine details and we will call you back.

(775) 882-3319

Monday to Friday, 7:00 am to 4:00 pm. Fax (775) 882-2693.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • Carson City since 1999
  • 4.6 on Google (15 reviews)

Request a free estimate

Your details
The machine

Up to 8 photos. Big photos are resized on your device before they are sent.

Free estimates. Your details go only to Industrial Logistics Services. We call back Monday to Friday, 7 am to 4 pm.