Moving tanks and silos

Tanks and silos are moved by checking where they can be lifted, hauling them on their side or upright as the height and wall allow, and tilting them upright in a controlled way at the new site. ILS rigs tall loads with forklifts, hoists and a 300-ton hydraulic gantry system, and hauls on trailers to 50 tons.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • 4.6 on Google (15 reviews)

Key points

  • Lift only at the lugs, saddles or rings the maker provides
  • Empty and clean the vessel, then check for confined-space rules
  • Long tanks are hauled on their side unless height allows upright
  • Tilting a tall load is planned in steps, with the base supported
  • Legs, ladders and cages are removed and moved separately
  • Free estimates

Process tanks, storage tanks, mixing vessels, hoppers and silos are shaped for what they hold, not for being moved. They are thin-walled, tall for their weight, and most have no flat place to hold. Industrial Logistics Services moves tanks and silos using its rigging gear, trailers and trucks.

Two main problems: balance and walls

A tall tank or silo has a high center of gravity, so it can tip if it is lifted or tilted carelessly. Its thin walls are meant to take internal pressure and the weight of the contents, not the point load of a sling or fork. For those reasons riggers lift from designed lugs, saddles, rings or skirts, or build a cradle or spreader to spread the load.

Height also drives the haul. A wide or tall tank may not clear bridges and overhead lines standing up, so it is often hauled lying down. Nevada's legal height limit is 14 ft (NRS 484D.605) and the width limit is 102 in. without a permit (NRS 484D.685). The oversize load checker helps check those numbers.

Preparation

The owner empties and cleans the vessel. A tank or silo can be a permit-required confined space, which OSHA covers at 29 CFR 1910.146, and grain bins and silos have their own rule at 29 CFR 1910.272. Those are for the owner's program, not the mover's. The mover needs to know what is attached to the vessel.

  1. Empty, clean and vent the vessel and confirm it is empty
  2. Disconnect piping, instruments, agitators and wiring
  3. Remove ladders, cages, platforms and loose legs and bundle them
  4. Confirm the dry weight and the lift lugs from the drawing or nameplate
  5. Measure height, diameter and the building opening
  6. Decide upright or lying down for the haul

Lifting and tilting

A tank that is laid on a trailer and set upright at its destination has to be tilted. This is done with a pair of lifting machines or with one lifting point and the base held to a pivot, so the tank swings up under control while its bottom is supported. A crew and forklifts work together, and a telehandler may be used.

The published equipment includes forklifts from 3,000 lbs. to 100,000 lbs. with rigging booms, a 300-ton hydraulic gantry system and hoists and slings inspected under 29 CFR 1910.184 and 1926.251.

Hauling and setting

Tanks ride on lowboys and flatbeds, with cradles that match the curve of the shell and chains at the legs or saddles. At the new site, the base or footing needs to be ready: anchors, pad, or the plant's floor. The vessel is placed, leveled and bolted, and the plant's team reconnects piping and electrical.

Estimate checklist

Send the diameter, height, dry weight, material, the fittings and lift lugs, photos, and the pickup and drop addresses. Estimates are free.

Sources (4)

Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

Start the estimate

Licensed in Nevada

Nevada State Contractors Board licenses 0046276 (C-33 Installing Industrial Machinery), 0083124 (A-14, A-20) and 0083125 (C-14I Rigging and Cranes, C-14J Conveyance of Goods). USDOT 642556, MC-531191.

What the classes cover

FAQ

Questions we hear

All questions

Can a stainless tank be moved without scratching it?

Slings and pads are used, and steel forks or chains stay off the polished surfaces. Handling plans are made for each vessel.

Can you set a silo upright?

Yes. ILS crews tilt and set tanks and silos upright with forklifts and rigging. The plan depends on height, weight and site.

Who does the confined-space work?

The owner's own program. ILS needs the tank empty and cleared before rigging.

Free estimates

Tell us what needs moving.

Free estimates on every job, big or small. Call the office or send the machine details and we will call you back.

(775) 882-3319

Monday to Friday, 7:00 am to 4:00 pm. Fax (775) 882-2693.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • Carson City since 1999
  • 4.6 on Google (15 reviews)

Request a free estimate

Your details
The machine

Up to 8 photos. Big photos are resized on your device before they are sent.

Free estimates. Your details go only to Industrial Logistics Services. We call back Monday to Friday, 7 am to 4 pm.