Moving injection molding machines

An injection molding machine is moved by separating the clamp unit from the injection unit when needed, draining hydraulic oil and cooling water, then rigging the base and hauling it on a trailer. ILS rigs and hauls plant machinery with forklifts to 100,000 lbs. with rigging booms and equipment trailers to 50 tons.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • 4.6 on Google (15 reviews)

Key points

  • Tie bars, platens and the injection unit are secured before any lift
  • Molds, hoppers, chillers and dryers are handled separately from the press
  • Hydraulic oil and cooling water are drained or capped as the maker directs
  • Floor anchors and leveling pads are checked at the new site
  • Forklifts from 3,000 lbs. to 100,000 lbs. with rigging booms
  • Free estimates

Molding machines are long, low and heavy, with a clamp end that holds the mold and an injection end that melts and pushes the plastic. They are full of hydraulic oil, water lines and electrical heaters. Industrial Logistics Services moves, sets and reinstalls machines like these for plants that are adding, replacing or relocating production.

Anatomy of a move

A molding press has two main ends. The clamp end opens and closes the mold on tie bars, and the injection end holds the barrel, screw and hopper. Smaller machines can be moved whole. On larger machines the maker may allow, or require, the injection unit to be unbolted from the clamp so each piece can be lifted and trucked within height and weight limits.

Beside the press sit auxiliary systems: a dryer, a chiller or temperature control unit, a conveyor, a robot or a mold cart. Each one has its own connections. A move plan lists them all so nothing is left behind.

Preparation before the riggers arrive

Plant maintenance locks out the electrical, hydraulic and cooling supplies under the plant's own program (29 CFR 1910.147), and OSHA's machine guarding rule at 29 CFR 1910.212 is a reminder that moving parts and heated barrels need to be treated carefully. Our guide to preparing a machine has the full checklist.

  1. Run out and purge the resin, then let the barrel and heaters cool
  2. Remove the mold and store it with its own protection
  3. Drain hydraulic oil if the maker advises, or cap lines to keep it from leaking
  4. Drain the water lines to the mold and the heat exchanger
  5. Lock the tie bars and platen in the transit position the manual specifies
  6. Label hoses, cables and sensor leads, and photograph the connections

Rigging and hauling

Because molding machines are long, a rigging boom on a forklift can lift them from the base rails, and machinery skates are used to move them inside the plant. For loads that exceed forklift capacity, a hydraulic gantry takes over. ILS lists a 300-ton hydraulic gantry system, a 2-ton portable aluminum gantry, and forklifts from 3,000 lbs. to 100,000 lbs. with rigging booms. Read about the full rigging forklift line.

On the road, a machine this long may need to travel on a lowboy or step deck, and a machine that exceeds legal width, height or length needs an NDOT permit under NRS 484D. The oversize permit guide shows the limits.

Setting up at the new location

The new floor needs to carry the machine's weight on its feet. Plants often use leveling pads or anchor bolts so the machine does not walk during cycling. Once the machine is positioned and leveled, power, cooling and hydraulics are restored; who handles each is agreed in the estimate. The leveling work is described on the precision leveling and alignment page.

Estimate checklist

Send the maker and model, the tonnage rating and approximate weight, the overall length, width and height, photos of the machine and the doorway, and the destination. Mention any auxiliary equipment going with it. Estimates are free.

Sources (3)

Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

Start the estimate

Licensed in Nevada

Nevada State Contractors Board licenses 0046276 (C-33 Installing Industrial Machinery), 0083124 (A-14, A-20) and 0083125 (C-14I Rigging and Cranes, C-14J Conveyance of Goods). USDOT 642556, MC-531191.

What the classes cover

FAQ

Questions we hear

All questions

Can the injection unit be separated for transport?

Often yes, if the manufacturer's manual permits it. The riggers follow the manual and the plan is explained in the estimate.

Do you move the dryers and chillers too?

Yes, we move auxiliary equipment along with the press. List them in your request so the estimate covers them.

Who reconnects water and power?

Who does it is agreed in the estimate. ILS coordinates the timing around the set and the leveling.

Free estimates

Tell us what needs moving.

Free estimates on every job, big or small. Call the office or send the machine details and we will call you back.

(775) 882-3319

Monday to Friday, 7:00 am to 4:00 pm. Fax (775) 882-2693.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • Carson City since 1999
  • 4.6 on Google (15 reviews)

Request a free estimate

Your details
The machine

Up to 8 photos. Big photos are resized on your device before they are sent.

Free estimates. Your details go only to Industrial Logistics Services. We call back Monday to Friday, 7 am to 4 pm.