Disconnect and reconnect coordination

A machine cannot be moved until its power, air, water and controls are safely disconnected, and it cannot run again until they are reconnected. Agreeing the order and timing early with your maintenance staff or licensed trades means the machine is ready to move when the riggers arrive and ready to hook up when it lands.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • 4.6 on Google (15 reviews)

Key points

  • Who disconnects and reconnects each utility is agreed in the estimate
  • Lockout/tagout is the plant's program (29 CFR 1910.147)
  • A utility list per machine keeps the handoff clear
  • ILS rigs, moves and sets the machine
  • ILS also holds the A-20 Industrial Piping and C-14J Conveyance of Goods classifications

Who handles each utility is agreed in the estimate, and in many cases the work must be done by licensed trades. The move plan sets what has to be off and capped before the lift, and what has to be ready when the machine is set.

Who does what

Disconnecting a machine is a handoff. The connections are isolated and removed, ILS rigs, moves and sets the machine, and then it is reconnected and tested. Who does each connection is agreed in the estimate. Agreeing on this line early prevents the common problem of a machine ready to move with nothing capped or a machine set with no one scheduled to connect it.

  • Electrical: lockout, disconnect and cap conductors
  • Compressed air and hydraulic lines: depressurize, drain, cap
  • Water, coolant and process fluids: drain and plug
  • Gas or fuel lines: shut off and cap by licensed trades
  • Controls, sensors and network cables: label and unplug

Lockout/tagout comes first

Federal rules on the control of hazardous energy, 29 CFR 1910.147, require machines to be de-energized and locked out before servicing or maintenance. That is the plant's program and the plant's people. A machine should be confirmed isolated before rigging starts. Our lockout/tagout guide covers what the plant does ahead of the riggers.

A utility checklist for every machine

A single sheet per machine saves trouble. It lists each utility, where it enters the machine, who disconnects it, who caps it and who will reconnect it at the new location.

  1. List every utility the machine uses
  2. Mark each connection point with a tag and a photo
  3. Assign the disconnect and the cap to a named trade
  4. Confirm the new location has the same service in the right place
  5. Schedule the reconnect for when the machine is set and leveled
  6. Test run with your operators and maintenance staff

Licenses and who does each connection

ILS holds Nevada licenses in A-20 Industrial Piping and C-14J Conveyance of Goods in addition to C-33 and A-14. Who does each utility connection is agreed in the estimate.

Agree the sequence early

The disconnect happens on the plant's clock and the lift on the moving crew's, so the two need to agree. Agree the disconnect sequence early so the lift and the shutdown line up, and have the plant confirm before moving day that each machine has been isolated and signed off.

What to send for coordination

Send a machine list, a note on who maintains each utility, and the target dates for the move. If you already have a lockout procedure for the machine, send it. Estimates are free.

Sources (3)

Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

Start the estimate

Licensed in Nevada

Nevada State Contractors Board licenses 0046276 (C-33 Installing Industrial Machinery), 0083124 (A-14, A-20) and 0083125 (C-14I Rigging and Cranes, C-14J Conveyance of Goods). USDOT 642556, MC-531191.

What the classes cover

FAQ

Disconnect & reconnect coordination: questions

All questions

Does ILS disconnect the electrical?

Who does each utility connection is agreed in the estimate. Either way, the machine is isolated and locked out under the plant's own program before the lift, and it is reconnected and tested after it is set and leveled.

What does ILS need from my maintenance team?

A list of the utilities on each machine, a named person for lockout, and the dates they can be on site for the disconnect and reconnect.

Can ILS help if the machine does not restart?

Leveling and alignment are part of ILS's installation work, and the placement is checked against the machine's drawings. Who handles electrical and controls work is agreed in the estimate.

Free estimates

Tell us what needs moving.

Free estimates on every job, big or small. Call the office or send the machine details and we will call you back.

(775) 882-3319

Monday to Friday, 7:00 am to 4:00 pm. Fax (775) 882-2693.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • Carson City since 1999
  • 4.6 on Google (15 reviews)

Request a free estimate

Your details
The machine

Up to 8 photos. Big photos are resized on your device before they are sent.

Free estimates. Your details go only to Industrial Logistics Services. We call back Monday to Friday, 7 am to 4 pm.