To store a machine for months, keep it dry, support it on a firm surface, protect bare steel, and write down its condition before it goes in. Indoor storage is better for long periods; outdoor storage can work if the machine is covered correctly and checked on a schedule.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • 4.6 on Google (15 reviews)

Key points

  • Moisture is the main enemy: use covers, barrier film and desiccant, not just a tarp
  • Support the machine on a firm base, off bare ground
  • Record condition with photos before storage and at each check
  • Decide about fluids, batteries and electronics before you store
  • Keep a way to get the machine out: access, clearance and a plan

Machines get stored when a plant closes, a line is replaced, a new building is not ready or a sale falls through. Corrosion and moisture, not time itself, do the damage. This guide covers common practice for preparing and storing equipment. Check the manufacturer's storage instructions where they exist, because some machines have specific needs.

Indoor or outdoor

Indoor space avoids most weather problems. Outdoor storage saves building space but demands better protection: elevated supports, a vapor barrier under the cover, and ventilation so condensation does not collect. Northern Nevada has big temperature swings between day and night, and condensation on cold steel is a real risk even in a dry climate.

ILS publishes up to 25,000 square feet of indoor storage and 5 acres of outside storage, used for machinery tied to a move. The arrangements depend on the machine.

Before the machine goes into storage

  1. Clean the machine; remove coolant, chips and process residue.
  2. Drain or treat fluids as the maker advises, and label what was done.
  3. Apply rust preventative to bare steel, ways and spindles.
  4. Remove or protect batteries, electronics and sensitive controls.
  5. Lock or block moving parts so they cannot shift.
  6. Photograph the machine from every side, including nameplates.
  7. Wrap with barrier film and add desiccant, or crate it for longer storage.
  8. Set it on a firm base: skids, timbers or a concrete pad.

Support and placement

A machine sitting on soft ground can settle and twist its frame. Use skids or timbers sized to the load, and keep the machine off soil. Leave aisle space so the machine can be inspected and loaded out without moving other items.

Heavy items should not be stacked or leaned against each other, and tall machines may need bracing against wind if stored outside. General industry rules also expect stored materials to be stable and secure against sliding or collapse.

Checks while in storage

Visit the machine on a schedule. Look for moisture under covers, rust blooms, animals or insects and any shift in the blocking. Replace desiccant when it is spent. A short written log makes it easy to see change over time.

Before the machine goes back into service, expect to clean off preservative, check lubrication, test controls and, for precision machines, level and align it again. Read how machines are leveled.

Getting the machine back out

Plan the exit when you plan the entry. Leave a clear path wide enough for the forklift or trailer, keep the ground firm where equipment must drive, and keep the release contact current. When the day comes, the crew will inspect the wrapping, unpack as needed and load the machine with the same method used to bring it in.

Paperwork that helps

See machinery storage for how storage ties into moves, and crating machinery for packing options. Whoever holds the machine, keep these records:

  • An inventory sheet listing each machine and its accessories
  • The condition photos and date
  • Manuals and tooling stored with or alongside the machine
  • A named contact for release, so the right person approves a pickup
  • The planned out-date, or a note that none is set
Sources (3)

Send the machine details

Type, size, weight, where it is and where it is going. Photos help. Estimates are free.

Start the estimate

Licensed in Nevada

Nevada State Contractors Board licenses 0046276 (C-33 Installing Industrial Machinery), 0083124 (A-14, A-20) and 0083125 (C-14I Rigging and Cranes, C-14J Conveyance of Goods). USDOT 642556, MC-531191.

What the classes cover

FAQ

Questions we hear

All questions

Can machinery sit outside?

Yes, if it is raised off the ground, wrapped with a vapor barrier and checked regularly. Indoor space is better for long periods or precision machines.

Do I need to drain the fluids?

It depends on the machine. Follow the manufacturer's instruction and record what you did so the machine can be restarted properly.

What does ILS store?

ILS stores machinery connected with its moving and installation work, with up to 25,000 square feet of indoor storage and 5 acres of outside storage.

Free estimates

Tell us what needs moving.

Free estimates on every job, big or small. Call the office or send the machine details and we will call you back.

(775) 882-3319

Monday to Friday, 7:00 am to 4:00 pm. Fax (775) 882-2693.

  • Nevada Contractors License 46276
  • USDOT 642556 · our own trucks
  • Carson City since 1999
  • 4.6 on Google (15 reviews)

Request a free estimate

Your details
The machine

Up to 8 photos. Big photos are resized on your device before they are sent.

Free estimates. Your details go only to Industrial Logistics Services. We call back Monday to Friday, 7 am to 4 pm.